The production line features two surface preparation stations, two NT-4 open-type spray booths for coating application, and a versatile 5×15 m NT-515 paint-drying chamber that ensures proper curing and finishing. All solutions are customized to meet client specifications and are designed to enhance both processing quality and overall productivity. A distinctive feature of the project is its division into zones based on technological operations: a surface preparation zone, a priming zone, and a paint and drying complex for applying and drying the finishing coating.
