Our project features a state-of-the-art, two-zone finishing system designed for efficient, high-quality door coating. The spacious 11x6m painting zone is equipped with an automatic door painting machine for consistent primer and topcoat application, complemented by two open-type spray booths for manual touch-ups and special finishes. The dedicated 9x8m drying zone, featuring vertical plenum systems, ensures uniform and rapid curing. The peculiarity of this project is thatall supply and exhaust ventilation units are installed on the roof for optimal shop space utilization